Industry
Project Management, Procurement and Engineering for Fiber Rollout — From Build Area to Marketing
consultingheads places freelance management consultants, interim managers, and subject-matter experts with network operators, telecommunications companies, and media firms. A suitable proposal is typically available within 24 to 36 hours.
The expansion is racing against funding deadlines, civil engineering capacity constraints, and material shortages. If project management or supplier management is lacking, it’s not an internal goal that gets pushed back—it’s a milestone date that the client already knows.
That is exactly what our network is designed for. We have over 23,000 vetted experts, selected based on what they have personally managed—expansion projects they’ve led, framework agreements they’ve negotiated, and alternative supply sources they’ve established.
Industry Landscape
Three Trends Currently Shaping Staffing Decisions in Telecommunications and Media
Building Is Outpacing Take-Up
The deployment rate rose by 9.2 percentage points within a year to 62 percent, representing 28.7 million reachable households and businesses. The connection rate, by contrast, increased only slightly to 29.8 percent, while the take-up rate remained at 27 percent. Every connection that is built but not used ties up capital—and shifts the focus from construction to marketing and operations.
Investment Conditions Are Shifting
For the first time since 2015, Deutsche Telekom’s competitors have invested less in network expansion than in the previous year. The investment climate fell by 13.3 percentage points; the business situation remains positive at 26.8 points, while the outlook stands at just 15.8. Rising costs for materials, construction, and financing are forcing companies to focus on more efficient expansion rather than opening more construction sites.
The Copper-to-fiber Migration Will Determine the Pace
77 percent of the companies surveyed would be willing to make further investments if there were a binding, rule-based roadmap for the transition from copper to fiber-optic networks. As long as that is missing, network operators are planning on two tracks—with dual operations, dual marketing, and a correspondingly doubled project workload.
Why Time Is of the Essence
More Connections, Less Room for Investment
27%The take-up rate is as follows: Only a little more than a quarter of the households that can be reached actually sign up for fiber-optic service.
BREKO Market Analysis 2026
The bottleneck is shifting from civil engineering to project management: marketing, transitioning existing customers, and managing service providers and materials are now the key factors determining the profitability of a development area.
Temporary staffing is designed to fill this gap: candidates with experience from comparable expansion projects, hired for the duration of the project, with a notice period of typically 5 to 10 days.
Areas of Competence
Eight Areas in Telecommunications and Media Where Challenges Most Frequently Arise
The same issues keep coming up, and they rarely fail due to a lack of knowledge. They fail because there isn't someone available to see them through to the end alongside day-to-day operations.
Project Management
Development areas, funding deadlines, and civil engineering partners are all intertwined, and the project management team is understaffed.
More on Project Management ›Procurement Consulting
Framework agreements for civil engineering, technical services, and installation are up for renegotiation, while costs are rising.
More on Procurement Consulting ›Supply Chain Consulting
Components with long lead times are at odds with expansion plans that have no buffer.
More on Supply Chain Consulting ›Customer Experience
The migration of existing customers determines the take-up rate—and it’s driven by service, not technology.
More on Customer Experience ›IT Consulting
Order management, network documentation, and billing rarely share the same database.
More on IT Consulting ›Cyber Security
Network infrastructure is subject to the requirements for critical infrastructure, including operational technology.
More on Cyber Security ›Controlling
The economic viability of each expansion area must be verifiable before construction begins, not after.
More on Controlling ›Process Consulting
There is a gap in the process between sales, construction, and commissioning that ensures the connection commitment is honored.
More on Process Consulting ›Successfully completed projects – experience you can rely on.
Find the right profile. Quick access to vetted experts.
Placement rate.
Our proposals lead to success.
Typical Assignments
Four Occasions in Which Network Operators and Media Companies Reach Out to Us
Most inquiries from the telecommunications sector fall into one of these four categories. The more precisely the occasion is specified, the faster we can provide a suitable recommendation.
The Build Area Is Behind Schedule
Civil engineering partners, permitting processes, and funding deadlines are out of sync, and the project management team is understaffed. We need someone who has already managed infrastructure projects with local governments and service providers.
Components Are Arriving Later Than the Excavators
Long lead times for equipment and installation materials are throwing the construction schedule off track. We need someone who can manage contracts, alternative suppliers, and call-offs all at the same time.
Built Doesn’t Mean Booked
The connections are in place, but the take-up rate remains low. We need someone who can structure the transition and customer outreach as a process rather than a campaign.
Incidents Escalate All the Way to the Executive Board
Report-up chains and lines of responsibility break down; every major disruption becomes a top priority. We need someone to establish incident response processes and lead them in an emergency.
Assignment lengths are based on experience with comparable placements; they are not a commitment.
Roles
Roles We Most Frequently Staff in Telecommunications and Media
They all get up to speed in a matter of days, not months, because they're familiar with the process from their own projects. The daily rate range and availability are listed on the respective role page.
8 profiles — scroll sideways
IT Rollout Manager
Manages rollout projects across multiple locations, from planning through acceptance.
View Role ›
Interim IT Project Manager
Manages projects across order management, network documentation, and billing.
View Role ›
Electrical Engineer
Responsible for technical planning, circuit design, and commissioning in the network environment.
View Role ›
Strategic Buyer
Renegotiate framework agreements for civil engineering, technical services, and installation.
View Role ›
Logistics Planner
Synchronize material availability and the construction schedule.
View Role ›
Contact Center Manager
Manages service and change communication as volume increases with expansion.
View Role ›
Business Controller
Provides a clear picture of cost-effectiveness for each expansion area, both before and after construction.
View Role ›
OT/ICS Security Consultant
Ensures that network and operational technology comply with the requirements for critical infrastructure.
View Role ›Not Sure Which Role You Need?
Describe the project, the area to be developed, and the start date. We’ll suggest a role, provide a daily rate range, and be upfront if something else is a better fit.
In Practice
What We Have Delivered in This Industry
Two real-world examples from the fiber-optic network expansion project and a case study: the starting point, the role played, and what changed as a result.
Task Force Established for Partner Sourcing
With an annual construction volume of over one billion euros, a newly formed task force brought together cost, quality, and long-term partnerships.
Read Case Study ›
Supplier Management Redesigned
A modular framework agreement made it possible to manage the construction partners in a scalable way—for the first time, the procurement, engineering, and rollout teams worked from the same document.
Read Case Study ›
Take-up Rate Increased in the Expansion Area
The opportunities were there, but few were capitalized on. A service designer structured the transition and customer outreach as a continuous process rather than a campaign.
Selection
How to Recognize Experience in Network Expansion
A certificate serves as proof of training. For staffing, what matters is who oversaw a network expansion project through to commissioning—and in what capacity: Deadlines, documentation requirements, and decision-making processes vary significantly depending on whether the expansion is self-funded, a cooperative model, or a subsidized project.
Delivers in the Project
- Monitor a development area through to commissioning, including scale and model
- Experience with grant application processes and documentation, not just with planning
- Managing civil engineering and installation partners under our own responsibility
Sounds Good, Does Not Help
- A "telecommunications" project that never involved a construction site
- Marketing experience without access to conversion and technical processes
- Group experience is required only during staffing of a regional operator
Further Information
- ›How delivery risks are assessed: Supply Chain Consulting
- ›How Industrial Systems Are Secured: Cyber Security
- ›How much does each roll cost, and when will it be available? Roles & Profiles
- ›What kind of contract, what term, and what notice period? Models of Collaboration
Collaboration
Three Types of Support in Telecommunications and Media
Whether it involves preparing a decision, providing capacity, or taking the lead—the scope is tailored to whatever the project currently lacks.
Freelance Management Consultants
Prepare the groundwork for decisions: expansion strategy, cooperation models, profitability by region, marketing rationale. This is appropriate when a course of action must be supported by sound reasoning.
More About Freelance Management Consultants ›
IT and Subject-Matter Experts
We provide the necessary resources for your project: technical planning, rollout, network documentation, service, and billing. The right choice when the direction is clear but you lack experienced personnel.
More About IT and Subject-Matter Experts ›
Interim Managers
Interim Leadership: Expansion, procurement, or operations, with the authority to issue instructions and responsibility for deadlines and costs. Ideal when a position is vacant.
More About Interim Managers ›Pricing
What an Assignment Costs
800–1,220 €
This is a rough estimate based on the roles linked on this page. The actual daily rate depends on the role, seniority, and requirements of the assignment.The range is an average based on the roles linked on this page—it does not replace a formal quote. The actual cost of a role depends on the level of responsibility, experience, and urgency; the range for each role is clearly stated on its respective role page. Costs are typically 30 to 60% of those of traditional management consultancies; the notice period is typically 5 to 10 days.
Telecommunications FAQ: What Decision-Makers Want to Know Up Front
A selection of two to four profiles is typically available within 24 to 36 hours. Three factors are key: the type of project, the size of the area, and whether the person will be required to interact with local governments and construction partners. From a network of over 23,000 vetted experts, positions in project management, procurement, and rollout can usually be filled on short notice.
Yes, and it has been proven: Two published case studies come from the fiber-optic sector—a task force for partner sourcing with an annual construction volume of over one billion euros, and the reorganization of supplier management through a modular framework agreement. Deutsche Glasfaser is a disclosed client name.
The median rate across all assignments is €1,050 per day. The rate depends on the role and level of responsibility: a temporary expansion manager earns more than a controller, while a project engineer falls somewhere in between. Costs are typically 30 to 60% of those of traditional management consultancies.
Because construction happens faster than leasing. The completion rate is 62 percent, the connection rate is only 29.8 percent, and the take-up rate is 27 percent. Every connection that is built but not used ties up capital without generating revenue—which is why the focus is shifting from civil engineering to marketing, conversion, and operations.
The interim manager assumes a temporary line management role—in expansion, procurement, or operations—with the authority to issue instructions and responsibility for meeting deadlines and staying within budget. The freelance management consultant prepares decisions: expansion strategy, partnership models, and profitability by region. The technical expert provides expertise in technical planning, rollout, or service.
Yes, and the scale is specified in the briefing because it affects decision-making processes. A regional operator makes decisions differently than a national corporation; in the case of municipal ownership, the supervisory board and public procurement law come into play. Anyone familiar only with corporate projects underestimates the pace of operations at a municipal utility.
Whether external services are eligible for funding depends on the program and the grant award notice. Project management and planning services are often recognized as eligible indirect costs if they can be clearly attributed to the funded area. We provide the supporting documentation required for the review of the statement of funds used; the assessment is made by your funding agency.
Typically, with a notice period of 5 to 10 days, depending on the agreed-upon term. Because expansion projects and rollouts have a defined end date, fixed-term staffing aligns well with the project. Extensions are the norm when the project transitions from construction to operation.
We will work with your legal or procurement department to clarify the contract type, reporting structures, work equipment, and documentation before we begin. If the project is sponsored by a local government, we will also need to address the issue of the procurement method and budget allocation. This does not replace legal advice.
The most in-demand roles are in project and rollout management, strategic sourcing and contract management, technical planning, and service and incident management. In addition, there is a need for cost-effectiveness analysis by region and operational technology (OT) security for the network infrastructure.
Most of the time, yes, because contracts, call-offs, and quality assurance run concurrently and involve the same people internally. An external role renegotiates framework agreements, evaluates alternative suppliers, and sets up the management process so that it continues after the mandate ends. This is exactly what our two case studies from the fiber-optic sector demonstrate.
Each profile undergoes an interview with a relevant subject-matter expert and is evaluated against the requirements of the mandate: supported development projects, including models and scale; results achieved; and references from comparable mandates. The placement rate across all mandates is 95 percent.
All Industries
Expertise in Other Industries
Expertise across a wide range of industries—with the same selection criteria.
Secure the Right Talent for Your Expansion Area Now
Describe your project, expansion plan, and launch date—you’ll receive hand-selected profiles from professionals with hands-on experience in construction, operations, and marketing.